Croatia opened its Part of Corridor 5C
2 Articles
2 Articles
Croatia has completed its part of the motorway connection between Budapest and the port of Ploče, after the motorway section from Beli Manastir to the border with Hungary was opened on Monday. Croatia has invested almost 900 million euros in the construction of its part of the international corridor, while Bosnia and Herzegovina still has to build the larger part.
Croatia opened its Part of Corridor 5C
The last section of the A5 motorway on the Croatian part of the 5C corridor, from Beli Manastir to the Hungarian border, was put into traffic on Monday, and Croatian Prime Minister Andrej Plenković said on that occasion that Croatia has thus completely fulfilled its part of the obligations in the construction of that international […] The post Croatia opened its Part of Corridor 5C appeared first on Sarajevo Times.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium