Published • loading... • Updated
Coal mine near Tumbler Ridge stuck with six-figure fine
Summary by The Hamilton Spectator
2 Articles
2 Articles
Tumbler Ridge coal mine operator must pay $800k fine, board rules – Energeticcity.ca
Operations at the Roman Mine portion of the Trend Mine were halted due to low coal prices. (Ottr Dan/Unsplash) TUMBLER RIDGE, B.C. — An operator of mines near Tumbler Ridge will have to pay a more than $800,000 fine for exceeding permitted selenium levels at two of its sites. An adjudicator with the Environmental Appeal Board (EAB) upheld the $809,700 fine against Peace River Coal (PRC) on August 27th. PRC began commercial operations at the met…
Coverage Details
Total News Sources2
Leaning Left1Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium