Biltmore Gets Final Design Approval, with Conditions, From Montecito Review Board
Summary by Noozhawk
1 Articles
1 Articles
All
Left
Center
1
Right
Biltmore Gets Final Design Approval, with Conditions, From Montecito Review Board
The long-running saga of the closure and construction of the Four Seasons Resort The Biltmore Santa Barbara may finally have an end in sight. On Thursday, the Montecito Board of Architectural Review granted final design approval with conditions. The Biltmore design team was told to reduce the size of the family pool complex for better wheelchair accessibility around the pool, improve planting areas, and improve landscape screening for privacy. …
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center1Last UpdatedBias Distribution100% Center
Bias Distribution
- 100% of the sources are Center
100% Center
C 100%
Factuality
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage