Published • loading... • Updated
Banana Point breakwater replacement moves forward with final funding secured
Summary by Petersburg Pilot
1 Articles
1 Articles
Banana Point breakwater replacement moves forward with final funding secured
The final piece of funding is in place for replacement of the deteriorating breakwater system at Banana Point, with construction expected to begin next spring. The Petersburg Borough Assembly accepted a $78,000 contribution last week from the Petersburg Indian Association to close a gap between the project's existing budget and the lowest construction bid. The borough has issued a notice to...
·Petersburg, United States
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
