B 180 Reschenstraße: Construction work at Kanzelgalerie in May
Summary by Land Tirol
1 Articles
1 Articles
All
Left
Center
Right
Barrier between Pfunds and Nauders from 5 May to 23 May, Monday to Friday from 8am to 12.30pm and from 1.30pm to 6pm Basic bypass via B 184 Engadiner Straße or B 185 Martinsbrucker Straße Outside the working hours or after completion of the work, one-lane traffic management by means of traffic lightsThe construction of the Kanzelgalerie on the B 180 Reschenstraße is in full swing.After the completion of the blasting, drilling and removal work in…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium