Aztec Completes First 7 Holes of Drilling Program at Tombstone Project and Increases Ownership in Project JV to 85%, Tombstone Gold-Silver Mining District, Arizona
Summary by goldseek.com
1 Articles
1 Articles
Aztec Completes First 7 Holes of Drilling Program at Tombstone Project and Increases Ownership in Project JV to 85%, Tombstone Gold-Silver Mining District, Arizona
Aztec Completes First 7 Holes of Drilling Program at Tombstone Project and Increases Ownership in Project JV to 85%, Tombstone Gold-Silver Mining District, Arizona The district geology consists of a mix of shallow-level, oxidized Au-Ag and base metal deposits related to CRD and skarns hosted in folded and thrusted sediments, intrusive dikes, and lode veins, and as well the under explored, sulfide versions located below the water table. Aztec Min…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium