Published • loading... • Updated
A "Squirrel" Convicted for Blocking a High-Voltage Power Line Construction Site in the Landes Region
Summary by Reporterre, Le Quotidien De L'écologie…
1 Articles
1 Articles
A "Squirrel" Convicted for Blocking a High-Voltage Power Line Construction Site in the Landes Region
Sadik Celik, a 62-year-old environmental activist nicknamed "the squirrel," was sentenced on February 2nd by the Dax court to a €1,000 suspended fine and ordered to pay over €25,000 in damages for blocking the construction of a high-voltage power line in the Landes region, according to the media outlet La Relève et la Peste. This project, involving a 400,000-volt direct current line, was being managed by Inelfe and RTE, the companies responsible…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
