7 Articles
7 Articles
Windtech International - LS Eco Advanced Cables launches consultation on Port of Tyne facility
LS Eco Advanced Cables (LSEAC), a joint venture between LS Group and Global Interconnector Group, has launched a five-week public consultation on its plans to build a high-voltage subsea cable manufacturing facility at the Port of Tyne. The cables would be used to transmit electricity generated by offshore wind farms to the UK mainland.
LSEAC to Invest £923 mn into High Voltage Cable Production Facility at Port of Tyne
LS Eco Advanced Cables Ltd (LSEAC) plans to develop a high-voltage cable production facility at the Port of Tyne, in the northeast of England, for undersea electricity transmission. It has launched a five-week public consultation, running from May 14 to June 18, on the proposed development, which will transport clean energy generated by offshore wind LSEAC has launched a five-week public consultation, running from May 14 to June 18, for a propos…
£923M high-voltage cable factory proposed for Port of Tyne
A major new manufacturing facility for under-sea high voltage cables has been proposed for the Port of Tyne by LS Eco Advanced Cables (LSEAC). The post £923M high-voltage cable factory proposed for Port of Tyne appeared first on New Civil Engineer.
Coverage Details
Bias Distribution
- 100% of the sources are Center
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage