The preparations for the renovation between Mulartshütte and Zweifall run with grubbing up. At the L24 the building site for the tunnel drilling machine of the Hasselbach overpass is cleared.
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The preparations for the renovation between Mulartshütte and Zweifall run with grubbing up. At the L24 the building site for the tunnel drilling machine of the Hasselbach overpass is cleared.