Published • loading... • Updated
WSDOT Completes Temporary Repairs Early, Signs Private Contract | Courier-Herald
Governor Bob Ferguson directs continuous work to restore the White River Bridge after severe damage from an August 18 semi-truck collision, with repairs expected in 6 to 8 weeks.
Summary by Courier-Herald
3 Articles
3 Articles
White River Bridge repair work starts Saturday
Permanent repair work gets underway Saturday on the State Route 410 White River Bridge between Buckley and Enumclaw, the Washington State Department of Transportation (WSDOT) said. WSDOT selected Guy F. Atkinson Construction to lead the work. The bridge has been shut down since August 18, when it was struck by a semi-truck and severely damaged. Under an emergency directive from Washington Governor Bob Ferguson, the work will continue seven days …
·Tacoma, United States
Read Full ArticleWSDOT selects contractor to begin permanent repairs on SR 410 White River Bridge Saturday, Sept. 13
BUCKLEY – The Washington State Department of Transportation selected Guy F. Atkinson Construction to deliver permanent repair on the State Route 410 White River Bridge between Buckley and Enumclaw. Contractors will begin work Saturday, Sept. 13.
·Washington, United States
Read Full ArticleCoverage Details
Total News Sources3
Leaning Left0Leaning Right1Center1Last UpdatedBias Distribution50% Center, 50% Right
Bias Distribution
- 50% of the sources are Center, 50% of the sources lean Right
50% Right
C 50%
R 50%
Factuality
To view factuality data please Upgrade to Premium