Published • loading... • Updated
WSDOT: Current 12 day closure at Tumwater Creek should be enough to complete project
Summary by MyClallamCounty.com
1 Articles
1 Articles
WSDOT: Current 12 day closure at Tumwater Creek should be enough to complete project
PORT ANGELES – Attention travelers. A 12-day closure of Highway 101 in Port Angeles begins Sunday, Sept. 14 101 will close in both directions between South Pine Street Cutoff and the Tumwater Truck Route for close to two weeks so crews working for the Department of Transportation can complete fish passage work at Tumwater Creek. 101 at Tumwater Creek will close in both directions at 6 p.m. Sunday, and crews will reopen the highway at noon on Fri…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium