Published • loading... • Updated
Work ramps up on Beveridge to Parkes section of Inland Rail
Summary by Rail Express
1 Articles
1 Articles
Work ramps up on Beveridge to Parkes section of Inland Rail
Work has commenced at Tallarook, where the rail tracks will be lowered beneath the Hume Freeway to accommodate for double-stacked freight trains. Image: Inland RailInland Rail carried out essential construction work on its Victorian sites during a 15-hour closure of the Albury Line last week, as the project moves towards completing the Beveridge to Parkes section by 2027. Work has significantly ramped up at the Tallarook and Seymour sites under…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
