The Trains, Stopped Between Simeria and Orăștie After the Tunnel at Turdaș Were Discovered Improvised Electrical Installations - HotNews.ro
4 Articles
4 Articles
The rail traffic was temporarily stopped on Sunday afternoons on both wires of magisterial 200, between Simeria and Orăștie, after improvised electrical installations located by unknown persons were discovered in the Turdaş railway tunnel. According to CFR SA, the traffic of trains was suspended from 14:49 for safety reasons. "The measure was ...
The trains were temporarily suspended on both traffic lines between Simeria and Orăștie on Sunday afternoon after the discovery of improvised electrical installations in a railway tunnel in the Turdaș area. CFR SA took this step to eliminate any possible risk to railway safety.
The National Railway Company "CFR-S.A. announced that on Sunday, from 14:49, the railway traffic was temporarily stopped at the distance of Simeria – Orăștie, within the area of the Regional Railway Branch Timisoara. The measure was taken after the CFR specialist staff identified in the Turdaș railway tunnel "improvised electrical installations, located by unknown persons. According to a press release, the competent authorities travelled on the …
Rail traffic was stopped on Sunday afternoon on Magistrala 200, due to some improvised electrical installations found by railway workers in the Turdaș tunnel. UPDATE. At 16:41, rail traffic was resumed on both lines of the Simeria - Orăștie distance, Magistrala 200, after the completion of the checks carried out in the area of the railway tunnel at Turdaș. Following the checks carried out on site, no elements were identified that would require t…
Coverage Details
Bias Distribution
- 50% of the sources lean Left, 50% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium






