See every side of every news story
Published loading...Updated

Traffic Summit at the Brenner, Historical Moment for the Base Tunnel

On 18 September, the Brenner is ready: after 16 years, the Brenner Base Tunnel will be hit below the state border between Italy and Austria. The 55-kilometre tunnel, costing 10.5 billion euros, is scheduled to go into operation at the end of 2032. An informal transport summit with EU Commissioner Tzitzikostas will also take place on the edge of the breakthrough ceremony.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

On 18 September, the Brenner is ready: after 16 years, the Brenner Base Tunnel will be hit below the state border between Italy and Austria. The 55-kilometre tunnel, costing 10.5 billion euros, is scheduled to go into operation at the end of 2032. An informal transport summit with EU Commissioner Tzitzikostas will also take place on the edge of the breakthrough ceremony.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Tiroler Tageszeitung Online broke the news in on Thursday, July 17, 2025.
Sources are mostly out of (0)