Timber arches top tunnel’s twin entrances - Infrastructure Magazine
Summary by Infrastructure Magazine
1 Articles
1 Articles
Timber arches top tunnel’s twin entrances - Infrastructure Magazine
Image: Government of Victoria/West Gate Tunnel ProjectThe towering timber entryways to Melbourne’s West Gate Tunnel are now complete. The new components mark a major visual and structural milestone for the long-awaited infrastructure project. The Allan Government confirmed that the twin tunnel portals – topped with 38-metre-high timber net structures – are now structurally finished. These entry and exit points serve as striking architectural lan…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium