They Eliminate Exit From Boca Sur Towards Colonel Prior to the White March of the Industrial Bridge
Summary by Diario Concepción
1 Articles
1 Articles
The Sociedad Concessionaria Puente Industrial reported, by means of a press release, that on Tuesday, September 2, the final phase of road adjustments in the sector of Boca Sur will begin, key stage in the security and connectivity measures before the start of the Industrial Bridge. In this phase, the exit from Boca Sur towards Coronel is eliminated, redirecting the vehicle flow through the Link Los Batros, where a new traffic light will be enab…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium