Skip to main content
See every side of every news story
Published loading...Updated

The Structural Element of the Algyő Railway Bridge Has Cracked, the Tram-Train Is only Running at 60 Km/h Instead of 100 Km/h

Summary by telex.hu
Traffic on the Tisza Bridge in Algyő has been slowed down due to a structural fault. According to MÁV, the timetable will not be affected for the time being, and the cause of the fault and how to fix it are still being investigated.

5 Articles

Right

A crack has been found in the bridge structure of the Algyő railway bridge. Tram-trains and trains can only travel at 60 kilometers per hour on the section.

·Budapest, Hungary
Read Full Article
Lean Left

Traffic on the Tisza Bridge in Algyő has been slowed down due to a structural fault. According to MÁV, the timetable will not be affected for the time being, and the cause of the fault and how to fix it are still being investigated.

Read Full Article

The restriction also affects the Szeged–Hódmezővásárhely tram-train and the trains running between Szeged and Békéscsaba.

There has already been a speed limit at the Algyő crossing due to the tram-train.

A cross brace on the Tisza railway bridge in Algyő has cracked, causing the tram to travel at only 60 kilometers per hour instead of 100 kilometers per hour between Szeged and Hódmezővásárhely.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 50% of the sources lean Left, 50% of the sources lean Right
50% Right

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

telex.hu broke the news on Sunday, September 20, 2026.
Too Big Arrow Icon
Sources are mostly out of (0)

Similar News Topics

News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal