The Association Pro Infrastructure Requires the Opening of the Railway Traffic on the Route Cluj - Poieni, From the Line to Oradea
6 Articles
6 Articles
The association Pro Infrastructure demands the opening of the traffic on the railway line between Cluj-Napoca and Poieni in the new march of 2027, appreciating that on lots 1 and 2 the physical stage of the works is 80%. The line is still interrupted between Bucea and Vadu...
The association Pro Infrastructura states that the sector Cluj Napoca – Poieni, 66 km, can be operated, under yard conditions, since 2027. The association states that although several years have passed since the start of the yard, the expropriations are not deforested and environmental agreements are not obtained. We redo the post: "The railway Cluj-Oradea [...]
The association Pro Infrastructure asks the Ministry of Transport and CFR to prepare the reopening of the circulation on the first 63 kilometers of the route, between Cluj-Napoca and Poieni on the railway line to Oradea, under the conditions in which the modernization works are approaching 80%, transmits Mediafax. The railway between Cluj-Napoca and Oradea was closed completely the circulation on 8 January [...]
The Cluj-Poieni Line Is Almost Ready, but Passengers Are Held on the Roof because of the Bureaucracy
The association Pro Infrastructure requests from the Ministry of Transport and CFR the recirculation of the trains on the first 63 km modernized of the railway Cluj-Oradea, between Cluj-Napoca and Poieni, with the new march of the trains previewed for the beginning of 2027. Closed completely on 8 January 2024 for reconstruction and electrification works financed by the PNRR, the [...] Article Cluj-Poieni Line is almost ready, but the passengers …
The trains could return, in 2027, between Cluj-Napoca and Poieni, on the railway line to Oradea, inaugurated more than 150 years ago. The Association Pro Infrastructure asks the Ministry of Transport and CFR to prepare the reopening of the traffic on the first 63 kilometers of the route, under the conditions in which the modernization works are approaching 80%.
The Pro Infrastructure Association asks the Ministry of Transport and CFR to take into account the resumption of the rail traffic between Cluj-Napoca and Poieni with the new march of the 2027 trains. The organisation claims that the first 63 kilometers of the Cluj-Napoca – Oradea railway, relating to lots 1 and 2, could be given in traffic at the beginning of next year, [...] Read the Pro Infrastructure Association asks for trains between Cluj-N…
Coverage Details
Bias Distribution
- 100% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium




