The Ministry of Construction Has Issued a Permit for System 50 at the Kostolac B3 Thermal Power Plant.
Summary by nin.rs
1 Articles
1 Articles
All
Left
Center
Right
"The operating permit has been issued for system 50 of block B3 at the Kostolac B thermal power plant, which represents the heart of the new power plant system."
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium