The first fair transition contest in the history of Spain has suffered a rodapalo that leaves it in just 22% of its awarded power. The Mudejar knot, in Teruel, sees how 937 megawatts (MW) of access capacity to the network are free after the environmental assessment has drastically limited the Endesa project (through its subsidiary Enel Green Power Spain). The Ministry for the Ecological Transition (MITECO) has announced that it will reallocate t…
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The first fair transition contest in the history of Spain has suffered a rodapalo that leaves it in just 22% of its awarded power. The Mudejar knot, in Teruel, sees how 937 megawatts (MW) of access capacity to the network are free after the environmental assessment has drastically limited the Endesa project (through its subsidiary Enel Green Power Spain). The Ministry for the Ecological Transition (MITECO) has announced that it will reallocate t…