Easter traffic: 12 kilometres of traffic jam in front of the Gotthard Tunnel
7 Articles
7 Articles
Travellers must be patient: The waiting time is currently over two hours, as the TCS reports.
On the north side of the Gotthard tunnel, a traffic jam of 12 kilometres in length was formed on Good Friday morning. Due to congestion, the motorcade came between Erstfeld and Göschenen in the canton of Uri.
20 minutes reports live from the Osterstau in front of the Gotthard Tunnel, which connects Göschenen with Airolo. You can find all current traffic information here.
This Good Friday, the north side of the Gotthard tunnel is stormedA 12-kilometre plug was formed on the north side of the Gotthard tunnel this morning. Due to the traffic overload, a line of cars was formed between Erstfeld and Göschenen, in the canton of Uri.The loss of time thus reaches up to two hours, says the Swiss Touring Club (TCS) on its website. The latter recommends the alternative route by the A13 and the San Bernardino tunnel.For Eas…


A 12-kilometre plug was formed on the north side of the Gotthard Tunnel this morning on Good Friday. Due to the traffic overload, a line of cars was formed between Erstfeld and Göschenen, in the canton of Uri.
The traffic jam in front of the Gotthard belongs to Easter as if looking for eggs. Since 1987 the tin avalanche in the Urnerland is a sad tradition – only the Corona pandemic provided an unexpected relief for two years.
Coverage Details
Bias Distribution
- 100% of the sources lean Left
To view factuality data please Upgrade to Premium