Skip to main content
See every side of every news story
Published loading...Updated

Seeg: Work on the Drinking Water System at the Nzeng-Ayong Roundabout

Summary by gabonactu.com
The Gabon Energy and Water Corporation (SEEG) announced in a press release that it will proceed on Wednesday, August 27, 2025 to work on the relocation of the drinking water distribution network to the Nzeng-Ayong district. This work consists of replacing three (3) defective metal circular nozzles with a triple concrete dalot between the Nzeng-Ayong daycare pharmacy and roundabout. As a result of this operation, disturbances in the drinking wate…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

The Gabon Energy and Water Corporation (SEEG) announced in a press release that it will proceed on Wednesday, August 27, 2025 to work on the relocation of the drinking water distribution network to the Nzeng-Ayong district. This work consists of replacing three (3) defective metal circular nozzles with a triple concrete dalot between the Nzeng-Ayong daycare pharmacy and roundabout. As a result of this operation, disturbances in the drinking wate…

·Gabon
Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

gabonactu.com broke the news in Gabon on Tuesday, August 26, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal