Published • loading... • Updated
Routine maintenance scheduled for US 180 bridge
Summary by Breckenridge American
1 Articles
1 Articles
Routine maintenance scheduled for US 180 bridge
A contractor with the Texas Department of Transportation will be performing routine maintenance on and under the US 180 bridge over Hubbard Creek Reservoir over the next two weeks.Work was scheduled to begin Wednesday, March 4 with work being completed from 7 a.m. to 5 p.m. each day for an estimated two weeks, weather permitting. During the maintenance there will be single-lane closures to ensure a safe work area for personnel and equipment.
·Breckenridge, United States
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium