Rio Tinto Health Centre with No Air Conditioning for a Year
Summary by Observador
1 Articles
1 Articles
In Rio Tinto's USF the windows are the temporary solution to cope with heat. But the climate problem, explains the health verifier of CM Gondomar, "not before 3 months" will be resolved.
·Portugal
Read Full ArticleCoverage Details
Total News Sources1
Leaning Left0Leaning Right1Center0Last UpdatedBias Distribution100% Right
Bias Distribution
- 100% of the sources lean Right
100% Right
R 100%
Factuality
To view factuality data please Upgrade to Premium