Truly Understand the News.
Published loading...Updated

A Serious Incident in the Tismana Career. A Landslide Blocked the Delivery of Coal to Rovinari Thermocentrala

Summary by Digi 24
A land survey took place in the Tismana career, administered by the Oltenia Energy Complex. The earth’s top surface covered the coal transport line that feeds the Rovinari Termocentrala.

4 Articles

All
Left
1
Center
1
Right
Center

A land survey took place in the Tismana career, administered by the Oltenia Energy Complex. The earth’s top surface covered the coal transport line that feeds the Rovinari Termocentrala.

·Romania
Read Full Article
Lean Left

Radu Miruză, USR member of Gorj, said on Sunday, in a Facebook post, that Saturday night he had a field study at the Tismana career of the Oltenia Energy Complex and claims that there is "pressure...

·Romania
Read Full Article

A land survey took place, on Saturday evening to Sunday, in the Tismana career, belonging to the Energy Oltenia complex, announced by USR Radu Miruța. According to this, there would have been pressures ...

The Miroçá Council (USR) said another land survey took place on Saturday night at the Tismana career, where 20 hectares of forest covered the coal transport line. It showed that the director of this mining operation was a pensioner who was forced to marry and pay the director.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • 50% of the sources lean Left, 50% of the sources are Center
50% Center
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Hot News broke the news in Romania on Sunday, June 15, 2025.
Sources are mostly out of (0)

Similar News Topics