President Prabowo Inaugurates Pertamina Geothermal Power Plant in Lampung, Capacity 55 Mw
Summary by viva.co.id
1 Articles
1 Articles
All
Left
Center
Right
developing new renewable energy based on geothermal energy or the construction of PLTP in Ulubelu Gunung Tiga, Lampung with a capacity of 55 MW.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium