Skip to main content
See every side of every news story
Published loading...Updated

Preparations Accelerate for Investigation of Reactor Containment Vessel Debris Collection at Fukushima Daiichi Nuclear Power Plant Unit 3 (Kyodo News)

Preparations are accelerating for the planned investigation into the reactor containment vessel of the Fukushima Daiichi Nuclear Power Plant Unit 3. TEPCO is not only conducting training to operate the ultra-small drone (13 cm long, 12 cm wide, 4 cm high, weighing 95 grams) developed for the investigation, but is also conducting training to secure flight space inside the containment vessel.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

Preparations are accelerating for the planned investigation into the reactor containment vessel of the Fukushima Daiichi Nuclear Power Plant Unit 3. TEPCO is not only conducting training to operate the ultra-small drone (13 cm long, 12 cm wide, 4 cm high, weighing 95 grams) developed for the investigation, but is also conducting training to secure flight space inside the containment vessel.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

熊本日日新聞社 broke the news in on Saturday, October 4, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal