Photovoltaic Conveyor Call Exhausted Within 33 Seconds
7 Articles
7 Articles
The pot for investment subsidies for photovoltaic systems was exhausted within 33 seconds at the latest production call. Criticism about the funding system exists from the federal inn of electrical engineering.
The interest representatives of the PV industry are angry with the rapidly exhausted feed pot for photovoltaic systems. After 33 seconds, the available funds were already allocated. What they now demand from energy state secretary Elisabeth Zehetner and how it goes on for those who have not received funding. The latest nationwide feed call for photovoltaic systems caused a lot of trouble. Out of a total of around 28,000 applications, only nearly…
20 million euros solar subsidies were awarded within seconds. "Under these conditions, no funding would be better," says the industry.
VIENNA. Pot for investment grants for photovoltaic systems at the latest call after 33 seconds.
“A PV subsidy whose budget is exhausted after just 33 seconds is not a reputable funding instrument, but a state-organized lottery. Today’s criticism from the electrical engineering industry confirms once again that the black-red-pink government has completely failed in its PV subsidy efforts. The ÖVP’s (Austrian People’s Party) inactive PR appearances clearly don’t solve any problems!” declared the Freedom Party’s energy spokespersons, MPs Axel…
Coverage Details
Bias Distribution
- 100% of the sources lean Right
Factuality
To view factuality data please Upgrade to Premium




