NRC says Warri-Itakpe line repaired but service remains suspended for safety measures
2 Articles
2 Articles
NRC Keeps Warri-Itakpe Line Closed Pending Further Upgrades
The Nigerian Railway Corporation (NRC) has confirmed that while the technical faults affecting the Warri-Itakpe Train Services (WITS) have been successfully repaired, operations will remain suspended to allow for additional safety measures and system improvements. In a statement released on Saturday, the NRC explained that the initial suspension, which commenced on April 10, 2025, was prompted by operational issues that posed significant risks t…
NRC says Warri-Itakpe line repaired but service remains suspended for safety measures
The Nigerian Railway Corporation (NRC) has said that although technical faults affecting the Warri-Itakpe Train Services (WITS) have been resolved, operations will remain suspended to allow for further safety and service upgrades. The post NRC says Warri-Itakpe line repaired but service remains suspended for safety measures appeared first on Nairametrics.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
To view factuality data please Upgrade to Premium
Ownership
To view ownership data please Upgrade to Vantage