New Visletto Bridge in Maggia Valley Will Be Built in Record Time
Summary by Handelszeitung
1 Articles
1 Articles
All
Left
Center
Right
By November 2026, a new bridge over the Maggia is to be completed in the valley of the same name, which was heavily damaged by a storm. The building costs 8.5 million Swiss francs and replaces the temporary Visletto bridge built by the army last summer.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium