Skip to main content
Holiday Sale — Get 40% off Vantage for yourself or as a gift
Published loading...Updated

Mumbai News: BMC To Set Up 100 MW Floating Solar Power Plant On Tansa And Modak Sagar Dams To Save ₹165 Crore In Power Costs

After the Middle Vaitarna project, BMC will now set up a 100 MW floating solar power plant on the Tansa and Modak Sagar dams. Developed and maintained by Mahatma Phule Renewable Energy and Infrastructure Technology Limited (MahaPreit) for 25 years, it is expected to generate 219 million units annually and save BMC around Rs 165.51 crore through subsidised power.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.Cross Cancel Icon

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality Info Icon

To view factuality data please Upgrade to Premium

Ownership

Info Icon

To view ownership data please Upgrade to Vantage

The Free Press Journal broke the news in Mumbai, India on Monday, November 3, 2025.
Too Big Arrow Icon
Sources are mostly out of (0)
News
Feed Dots Icon
For You
Search Icon
Search
Blindspot LogoBlindspotLocal