Massive Drainage Project in Çarşamba Plain 51% Completed: Lifeline Water Supply for 99 Neighborhoods
2 Articles
2 Articles
In Samsun, the "Çarşamba Plain Right Bank 2nd Section Surface Drainage" and "Completion of Pumped Drainage of Land Below 2 Meters Elevation 2nd Section Project," which is being constructed by the State Hydraulic Works (DSİ) and will benefit 99 neighborhoods, is 51% complete. The 1.5 billion TL project, which aims to provide drainage for 53,507 hectares of agricultural land in the Çarşamba and Terme plains, has seen the completion of one bridge, …
Massive Drainage Project in Çarşamba Plain 51% Completed: Lifeline Water Supply for 99 Neighborhoods
In Samsun, the Çarşamba Plain Right Bank 2nd Section Surface Drainage and Pumped Drainage of Land Below 2 Meters Elevation Completion Project, which is being carried out by the State Hydraulic Works (DSİ) and will benefit 99 neighborhoods, is 51% complete.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium






