Pipera Metro Will Extend to Petracani. Metrorex Plans for Magistrala 2
6 Articles
6 Articles
Metrorex announces that Magistrala 2 metres will be extended east, on the Pipera - Petricans throne, and for this purpose it has been signed, a co-operation protocol between the Ministry of Transport and Company. The new section will include two metro stations, with modern facilities and interconnected with surface transport. According to Metrorex representatives, the investment is a strategy, in the context of rapid growth of the Pipera-Tunari …
The Berceni 2 metric discipline – Pipera, or the "corporate discipline" as it is called the metric line that ensures the connection to the Aviation-Pipera cartel where there are numerous office buildings, will be extended by two...
The project is intended to build a section about 1.6 km from the double road, on the Boulevard Dimitrie Pompeiu and Petricani Street, until the intersection with Bulevardud Pipera
At the headquarters of the Ministry of Transport and Infrastructure, the co-operation protocol was signed for the launch of the two-metre Magistral extension project on the Pipera – Petricani throne.
The documentation for the extension of the M2 metro line has been signed, on the Pipera-Petricani section. The project envisages the extension of the line by 1.6 km of double track, including two modern stations. The cost is estimated at 120 million euros excluding VAT, announces the City Hall of Sector 2. "Good news for the residents of Sector 2! The M2 metro line will be extended with two more stations, […] The post M2 metro line will be exten…
The Pipera-Petricani metro line, an extension of the Tudor Arghezi-Pipera Main Line 2, will be built by the City Hall of Sector 2. "Today, together with Rareș Hopincă, the mayor of Sector 2, and Mariana Miclăuș, general director of Metrorex, I signed the collaboration protocol between the Ministry of Transport and Infrastructure, the City Hall of Sector 2, and Metrorex for the extension of Main Line 2, on the Pipera-Petricani section. The projec…
Coverage Details
Bias Distribution
- 50% of the sources lean Left, 50% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium