LONGi Solar Boosts Romania’s Renewable Transition with Major Retail Infrastructure Project
Summary by solarquarter.com
1 Articles
1 Articles
All
Left
Center
Right
LONGi Solar Boosts Romania’s Renewable Transition with Major Retail Infrastructure Project
LONGi Solar has deployed 54.1 MW of Hi-MO 9 back contact (BC) modules at Romania’s largest retail infrastructure solar park, CEF Chișineu-Criș in Arad County. Developed for NEPI Rockcastle’s subsidiary […] The post LONGi Solar Boosts Romania’s Renewable Transition with Major Retail Infrastructure Project appeared first on SolarQuarter.
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium