Late trains, old bridges, no signal: Germany's infrastructure woes
9 Articles
9 Articles
Late trains, old bridges, no signal: Germany infrastructure woes
FRANKFURT — Running late and vastly over budget, a mammoth rail project stands as a monument to what critics say is Germany’s glaring failure to tackle long-standing infrastructure woes. “Stuttgart 21” is envisaged as a major, futuristic rail hub in the southwestern city, a fitting gateway to a region home to the headquarters of corporate heavyweights such as Bosch and Mercedes-Benz. But 15 years after work began, the project — which involves re…
Late trains, old bridges, no signals: Germany’s rail project that never ends - Malaysia now
Most Read Malaysia / 18 h ago Malaysia / 18 h ago Life / 6 h ago Malaysia / 17 h ago Malaysia / 3 h ago Malaysia / 3 h ago Malaysia / 16 h ago Life / 16 h ago Malaysia / 16 h ago Malaysia / 16 h ago Malaysia / 17 h ago Malaysia / 1 h ago Malaysia / 3 h ago Malaysia / 2 h ago Malaysia / 15 h ago You May Also Like Related Articles Life / 25 m ago Life / 6 h ago Life / 6 h ago Just IN 1 m ago 29 m ago 33 m ago…
Late trains, previous bridges, no sign: Germany's framework points
Running late and considerably over finances plan, an enormous rail process stands as a monolith to what film critics state is Germany’s blazing failing to take care of long-lasting framework points. “Stuttgart 21” is imagined as a major, superior rail heart within the southwestern metropolis, an appropriate entrance to an space residence to the top workplace of enterprise heavyweights resembling Bosch and Mercedes-Benz But 15 years after job beg…
Coverage Details
Bias Distribution
- 50% of the sources lean Left, 50% of the sources are Center
To view factuality data please Upgrade to Premium