Largest solar project in Southwest Public Power Agency territory is activated
Summary by Pv Magazine USA
1 Articles
1 Articles
All
Left
Center
Right
Largest solar project in Southwest Public Power Agency territory is activated
The 300 MW Box Canyon solar project was developed by BrightNight and Cordelio Power.BrightNight, a renewable energy developer serving utilities, datacenters, and commercial and industrial customers, and its joint venture partner Cordelio Power, an independent power producer, announced the commercial operations of a 300 MW solar project in Arizona. Located in the town of Florence, Arizona, the project is expected to generate over 915,000 MWh of e…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium