Skip to main content
See every side of every news story
Published loading...Updated

Koryx Copper Announces Further Drill Assay Results Extending Consistent Mineralization at Depth and Laterally at the Haib Copper Project, Southern Namibia

Summary by Benzinga
Highlights • Completed a further 7 drill holes for 2,986m out of a planned 178 holes in Phase 2, 3 and 4. • 15,349m of the 28,000m drill target for 2025 has been completed to date. • Drill results extended mineralization into some areas previously modelled as waste. • HM75: 927m @ 0.24% Cu (entire hole)   14m @ 0.58% Cu (4 to 18 m)   60m @ 0.33% Cu (302 to 362m)   28m @ 0.35% Cu (422 to 450 m)   48m @ 0.34% Cu (820 to 868m) • HM77: 98m …

Bias Distribution

  • 50% of the sources lean Left, 50% of the sources are Center
50% Center

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

Benzinga broke the news in New York, United States on Thursday, August 28, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal