Skip to main content
See every side of every news story
Published loading...Updated

Kh. Bulgaa: the Progress of the Road Renovation Behind the First District and up to the Bayankhoshuu and Baruunsalaan Intersections Is 15 Percent.

Summary by ikon.mn
The 2.7 km road behind the First District and the 5.6 km road on Bayankhoshuu or Trade Union Street have reached 15 percent of the progress in expanding and upgrading them to a comprehensive, street-level road standard. These projects, implemented in collaboration with the World Bank, will include the installation of sidewalks, bicycle paths, roads, green spaces, drainage networks, pedestrian overpasses, signs, and speed bumps in areas with high…
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

1 Articles

The 2.7 km road behind the First District and the 5.6 km road on Bayankhoshuu or Trade Union Street have reached 15 percent of the progress in expanding and upgrading them to a comprehensive, street-level road standard. These projects, implemented in collaboration with the World Bank, will include the installation of sidewalks, bicycle paths, roads, green spaces, drainage networks, pedestrian overpasses, signs, and speed bumps in areas with high…

Read Full Article
Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.

Factuality 

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

ikon.mn broke the news in on Friday, August 29, 2025.
Sources are mostly out of (0)
News
For You
Search
BlindspotLocal