Don't Just Read the News, Understand It.
Published loading...Updated

Site Studies for Second Nuclear Power Plant Could Take 4 Years

Summary by Rzeczpospolita
According to the draft update of the Polish Nuclear Power Program, the two preferred locations for the second nuclear power plant in Poland are Konin and Bełchatów. - Geological research is currently underway - informed the Minister of Industry Marzena Czarnecka in a video posted by the ministry on platform X.
DisclaimerThis story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.

2 Articles

All
Left
Center
Right

According to the draft update of the Polish Nuclear Power Program, the two preferred locations for the second nuclear power plant in Poland are Konin and Bełchatów. - Geological research is currently underway - informed the Minister of Industry Marzena Czarnecka in a video posted by the ministry on platform X.

·Poland
Read Full Article

There are two preferred locations where a nuclear power plant could be built in Poland: Konin and Bełchatów; geological research is currently underway, said Minister of Industry Marzena Czarnecka in a video posted by the ministry on platform X. She added that such research typically lasts about four years. The article It is still unknown where the nuclear power plant will be built in Poland comes from the website Wszystko co końca.

Think freely.Subscribe and get full access to Ground NewsSubscriptions start at $9.99/yearSubscribe

Bias Distribution

  • There is no tracked Bias information for the sources covering this story.
Factuality

To view factuality data please Upgrade to Premium

Ownership

To view ownership data please Upgrade to Vantage

wszystkoconajwazniejsze.pl broke the news in on Thursday, July 3, 2025.
Sources are mostly out of (0)