Published • loading... • Updated
Inland Rail takes step forward with new bridge to be craned into place
Summary by Rail Express
1 Articles
1 Articles
Inland Rail takes step forward with new bridge to be craned into place
A 600-tonne crawler crane will lift the new Broadford-Wandong Road bridge into place. Image: Inland RailA new bridge in Wandong will be craned into place in mid-February, marking an important milestone for the Inland Rail project. Made up of 41 girders in total and assembled on-site, the Broadford-Wandong Road bridge is 35 metres long, 14.5 metres wide and weighs approximately 246 tonnes. It will be craned into place by a 600-tonne crawler cra…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
