Published • loading... • Updated
Ice setup delayed at Glengarry Sports Palace in Alexandria
Summary by The Record
3 Articles
3 Articles

+2 Reposted by 2 other sources
Ice setup delayed at Glengarry Sports Palace in Alexandria
The Glengarry Sport Palace rink refrigeration system is made up of chillers, steel pipes and brine water as an antifreeze agent, to maintain the temperature needed to maintain the ice inside the arena. The current chiller system, installed in 2010,…
·Niagara Falls, Canada
Read Full ArticleCoverage Details
Total News Sources3
Leaning Left3Leaning Right0Center0Last UpdatedBias Distribution100% Left
Bias Distribution
- 100% of the sources lean Left
100% Left
L 100%
Factuality
To view factuality data please Upgrade to Premium