Afinia reported that he performed technical maneuvers to stabilize the network, after the increase in electricity consumption, associated with high temperatures and the El Niño phenomenon, led to the capacity of the Montería 5 circuit to the limit.
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
Afinia reported that he performed technical maneuvers to stabilize the network, after the increase in electricity consumption, associated with high temperatures and the El Niño phenomenon, led to the capacity of the Montería 5 circuit to the limit.