Published • loading... • Updated
Helix Electric Installs Prefabricated Electrical Building at Water Treatment Plant in Northern California
Summary by Construction Superintendent
1 Articles
1 Articles
Helix Electric Installs Prefabricated Electrical Building at Water Treatment Plant in Northern California
Helix Electric installed a prefabricated electrical building at the Orinda Water Treatment Plant. It will provide cleaner drinking water to more than 800,000 East Bay residents in both Contra Costa and Alameda counties in Northern California. The installation supports East Bay Municipal Utility District’s $267-million project to reduce disinfection byproducts in the water supply. Project partners include EBMUD and Flatiron Construction. The compa
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium
