Pertamina Starts Construction of Green Hydrogen Pilot Plant at Ulubelu Geothermal Site, Indonesia - Hydrogen Central
4 Articles
4 Articles
Pertamina inicia la construcción de una planta piloto de hidrógeno verde en el proyecto geotérmico de Ulubelu, Indonesia | PiensaGeotermia - Noticias de energía geotérmica
PT Pertamina Geothermal Energy ha iniciado la construcción de una planta piloto de hidrógeno verde en el sitio geotérmico de Ulubelu en Lampung, Indonesia.
Pertamina starts construction of green hydrogen pilot plant at Ulubelu geothermal site, Indonesia - Hydrogen Central
Pertamina starts construction of green hydrogen pilot plant at Ulubelu geothermal site, Indonesia PT Pertamina Geothermal Energy (PGEO) has broken ground on the construction of the Green Hydrogen Pilot Plant in in Ulubelu in Lampung, Indonesia. The green hydrogen production facility, planned to be operational by 2026, will be supplied by electricity from the Ulubelu geothermal power plant. Early studies on producing green hydrogen at the Ulubelu…
H2-View News: Pertamina Geothermal breaks ground on green hydrogen pilot
The state-backed company plans to use anion exchange membrane (AEM) electrolysis technology with efficiencies of 82-88% to produce green hydrogen. PGE has not disclosed either the chosen electrolyser supplier or the expected commissioning date. Using geothermal energy to produce green hydrogen provides a flexible offtake for its baseload electricity, creating value beyond traditional power sales.
PT Pertamina Geothermal Energy Tbk (PGE) (IDX: PGEO) has begun a new chapter in clean energy development in Indonesia by launching the Green Hydrogen Pilot Project.
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium