Geotechnical work underway to advance the extension of GO train service in Ontario east
Summary by Insauga
1 Articles
1 Articles
All
Left
Center
Right
Geotechnical work underway to advance the extension of GO train service in Ontario east
The slow progress of work towards the extension of GO train service to Bowmanville is taking another step this summer with geotechnical soil testing taking place near the Simcoe Street and Albert Street bridges in Oshawa. Metrolinx has hired XS Soil Solutions (and its subcontractor Strata Drilling Group) to conduct soil characterization sampling to help “inform” the design and construction planning of future infrastructure upgrades that will eve…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium