Fluxys Awards Sacyr Proyecta Contract for Zeebrugge LNG Terminal
Summary by LNG Industry
2 Articles
2 Articles
Fluxys has awarded Sacyr Projecta a new contract for the development of FEED (Front End Engineering Design) services at its liquefied natural gas (LNG) terminal in Zeebrugge (Belgium). The scope of the project includes engineering for the installation of new sea water vaporizers (ROVs), their corresponding pumps and a new catchment drawer in the terminal’s port facilities. This project aims to reduce CO2 emissions from the terminal while maintai…
Coverage Details
Total News Sources2
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium