Farrans lands £30m terminal expansion at Bristol Airport
3 Articles
3 Articles
Bristol Airport awards £30m terminal extension contract to Farrans
Bristol Airport has awarded a £30m (US$40m) contract to Farrans for a two-floor terminal extension as part of its wider £400m (US$534m) transformation program. Construction has begun on the extension, which will infill space between the existing terminal and the departure gates. The project is designed to support an increase in capacity to 12 million passengers per year. The expanded terminal will increase floor space by nearly 45% and include 1…
Bristol Airport awards £30m terminal construction extension contract to Farrans
Bristol Airport has awarded a £30m terminal extension project to leading building and civil engineering contractor Farrans, as it continues with its plans to invest £400 million to transform the airport experience for customers. Work has already commenced on the two-floor terminal extension which will infill an area between the existing terminal building and the departure gates. The new area will cater for an increase to 12 million passengers …
Farrans lands £30m terminal expansion at Bristol Airport
Farrans has secured a £30m contract to deliver a major terminal extension at Bristol Airport, as part of the airport’s wider £400m improvement programme. Appointed as main contractor, Farrans – a subsidiary of John Sisk & Son since November 2025 – has begun work on a two-storey extension that will infill the space between the existing terminal building and the departure gates. The scheme is designed to support projected growth to 12 million pass…
Coverage Details
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium