EMR Cuts Intercity Services From Monday After Brand New Trains Unreliable and Older Trains Suffer Maintenance Delays
EMR said the cutbacks will affect up to half of services as it works with Hitachi Rail to fix reliability problems across both fleets.
7 Articles
7 Articles
New HS2 farce as firm with £2bn contract builds trains that keep breaking down
A raft of services will be cut from Monday between London and the Midlands after trains made by Hitachi, the firm awarded a £2bn HS2 contract, have reported multiple issues
Revised train timetable enforced as EMR admits 'ongoing reliability challenges' on Corby, Kettering and Wellingborough services
The boss of East Midlands Railway (EMR) has admitted ‘significant disruption and inconvenience’ to customers are the results of ‘ongoing reliability challenges’ of trains including those serving Corby, Kettering and Wellingborough.
EMR cuts intercity services from Monday after brand new trains unreliable and older trains suffer maintenance delays
East Midlands Railway (EMR) has announced a temporary reduced Intercity timetable from Monday 20 July. The operator said that this has become necessary because the performance of Hitachi Rail’s new Aurora Class 810 fleet and their maintenance of EMR’s existing Class 222 fleet has significantly impacted upon EMR’s ability to run a consistent Intercity service […]
London–Midlands rail services cut as EMR battles trains reliability crisis
Ongoing problems with Hitachi Rail’s new Class 810 Aurora trains have led East Midlands Railway (EMR) to cut its intercity services between London St Pancras and the Midlands. Aurora train leaving Sheffield Station (c) EMR EMR says it has introduced the reduced timetable following persistent performance issues with Hitachi Rail’s new Class 810 Aurora trains, as well as maintenance problems affecting the existing Class 222 Meridian fleet. The rev…
Coverage Details
Bias Distribution
- 60% of the sources are Center
Factuality
To view factuality data please Upgrade to Premium




