The equipment was installed to guarantee the operation of water pumps in the face of possible power outages. Concordia Municipality reported that the first tests yielded positive results, as part of the prevention measures against possible floods of the Uruguay River and intense rains.
This story is only covered by news sources that have yet to be evaluated by the independent media monitoring agencies we use to assess the quality and reliability of news outlets on our platform. Learn more here.
The equipment was installed to guarantee the operation of water pumps in the face of possible power outages. Concordia Municipality reported that the first tests yielded positive results, as part of the prevention measures against possible floods of the Uruguay River and intense rains.