Published • loading... • Updated
DPWH-10 turns over P160-m flood control project in Oro
Summary by Mindanao Gold Star Daily
1 Articles
1 Articles
DPWH-10 turns over P160-m flood control project in Oro
THE Department of Public Works and Highways (DPWH-10) on Tuesday, Oct. 7, turned over a P160-million flood control project in Zone Camarahan, Barangay Pagatpat.DPWH-10 Project Engineer Luke Regil Hebron said the structure was designed to withstand a magnitude seven to eight earthquake and features a walkway and railings for residents’ use. “Transparent kaayo ta sa atong mga projects when it comes information, daghan tag portals to make to verify…
Coverage Details
Total News Sources1
Leaning Left0Leaning Right0Center0Last UpdatedBias DistributionNo sources with tracked biases.
Bias Distribution
- There is no tracked Bias information for the sources covering this story.
Factuality
To view factuality data please Upgrade to Premium